‌‌Canada Education Park: New Chilliwack Library: Chilliwack: March 2011 and beyond

The library is planning a move to the Canada Education Park next summer. The new building
is under construction on the Trades campus. We'll update this page with information as the
move progresses.

The library seen here under construction on November 25, 2011.




Construction debris inside the new library on November 25, 2011.  
 
Librarians inside the new building looking toward the library on November 25, 2011. Looking from the new library into the future computer lab on November 25, 2011.
Library building can be seen at left in this April 8, 2011 photo. Looking toward the river, the library building can be seen at the back of this April 8, 2011 photo.
Library is on the bottom in this May 2, 2011 photo. The library seen here under construction on February 15, 2011.




Architect's drawing of the new building. The library can be seen at lower right.

Links:

Facebook: See past photos of the construction on the library's Facebook page: http://www.facebook.com/home.php#!/pages/University-of-the-Fraser-Valley-Library/98493429916

Link to the library blog: http://ufvlibrary.blogspot.com/2011/02/under-construction-new-chilliwack.html

Link to map showing Canada Education Park location: CEP Google map

Plans: Campus plans and updates: http://www.ufv.ca/Campusplanning/Campus_Architecture/Campus_Plans___Updates.htm

Updated December 13, 2011, lm.

YouTube goUFV Linkedin Facebook Twitter Flikr Signup for eNews!