Skip to main content

Sustainable UFV

Makeup air units (MAU) replacements

Makeup air units (MAU) replacements — Quick facts

  • Status: Completed
  • Location: Building A-west, Abbotsford Campus
  • Completion date: 2025

Project overview

The project aims to replace the two existing gas-fired MAU units with two new hybrid VRF heat pump MAU units with natural gas backup to reduce natural gas consumption and GHG emissions.

Project features

  • Decommission and remove two existing MAU units
  • Install and commission two new MAUunits
  • Install controls for new mechanical equipment.

Related SDGs:

Clean energy, Climate action

 

Contact Us